Create an hours-based job
Plan maintenance using operating hours and reading history.

- Enter the description, group and interval hours.
- Record the last-done and current running-hour values.
- Inspect the target hours and remaining hours before saving.
Example
For a pump serviced at 1,000 hours with a 500-hour interval, the next target is 1,500 hours. At 1,300 current hours, 200 remain.
Check the result: Inspect the target hours and remaining hours before saving.